25
2024
-
04
Yiyang Kinglon New Materials Co., Ltd. Cleaner Production Information Publicity
Classification:
According to the "the People's Republic of China Cleaner Production Promotion Law", "Cleaner Production Audit Measures" and other relevant documents, in order to improve the company's environmental management level, realize source reduction and whole-process control, and create a resource-saving and environment-friendly company, the company started this round of cleaner production audit in April 2023, and entrusted Hunan Meijing Environmental Protection Technology Consulting Service Co., Ltd. to provide technical guidance on the audit work. The company's cleaner production audit and the basic information of the company, pollutant discharge and total control are announced as follows. All sectors of the society are invited to supervise the implementation of cleaner production audit by our company.
1.EnterpriseContact Information
Company: Yiyang Kinglon New Materials Co., Ltd.
Contact address: 208 Meilin Road, Yiyang High-tech Industrial Development Zone
Contact: Liu Xiong
Contact number: 18608416157
2. cleaner production audit consulting unit and contact information
Consulting Unit: Hunan Meijing Environmental Protection Technology Consulting Service Co., Ltd.
Contact address: 32E, Jiatian Building, No. 359, Section 2, Furong Middle Road, Yuhua District, Changsha City
Zip Code: 410116
Contact: Tang Ziyu
Contact number: 15073705003
3. Cleaner Production Audit Procedures and Main Contents
Cleaner production audit procedures: audit preparation → pre-audit → audit → scheme generation and screening → scheme feasibility analysis → scheme implementation → continuous cleaner production.
Main contents: under the guidance of Hunan Meijing Environmental Protection Science and Technology Consulting Service Co., Ltd., Yiyang Kinglon New Materials Co., Ltd. has set up a clean production audit leading group and working group to supplement and improve the company's clean production management system and reward management system. Through on-site investigation and investigation, evaluate the current level of clean production in the production process of Yiyang Kinglon New Materials Co., Ltd. in terms of energy consumption, Materials consumption, production and pollution discharge, production efficiency and management, identify the problems, potentials and opportunities in cleaner production, and determine the focus of this round of cleaner production audit and cleaner production objectives based on this. Through the Materials and energy balance of the production process of Yiyang Kinglon New Materials Co., Ltd., identify the links and parts of Materials and energy loss, the links and parts of pollutants, and on the basis of analyzing the Materials consumption, energy consumption and causes of pollutants in the production process, propose and implement a number of effective no/low cost, medium/high cost clean production programs, so as to reduce the resource and energy consumption of the production process, reduce the generation and emission of pollutants, improve the overall clean production level of the production process, and promote the sustainable development of the company.
Basic information and pollutant discharge of 4. enterprises
Table1Enterprise Basic Information Table
Name of Enterprise |
Yiyang Kinglon New Materials Co., Ltd. |
||
Legal Representative |
Zhang Qunli |
scale of production |
Annual output of iron-based ceramic composite wear-resistant Materials 6000 tons |
Enterprise registered address |
208 Meilin Road, Yiyang High-tech Industrial Development Zone |
Production Address |
208 Meilin Road, Yiyang High-tech Industrial Development Zone |
Table2Table of Pollutant Emissions from Major Air Pollution Sources
Name of pollution source and pollutant |
Executive standards |
||
Name of air pollution source |
exhaust pollutants |
Standard Limits (mg/m3) |
Standard No. |
Waste gas discharge port for sand treatment and shot blasting |
Particulate matter |
30 |
Emission standard of air pollutants for foundry industry GB 39726-2020 |
Intermediate frequency furnace waste gas discharge port |
Particulate matter |
30 |
|
Paint exhaust vent |
Particulate matter |
30 |
|
non-methane total hydrocarbon |
100 |
||
Total volatile organic compounds |
120 |
||
Benzene |
1 |
||
benzene series |
60 |
||
Discharge port of smelting waste gas in sand casting workshop |
Particulate matter |
30 |
|
Sand casting sand treatment waste gas discharge port |
Particulate matter |
30 |
|
Falling sand treatment waste gas discharge port |
Particulate matter |
30 |
|
Waste gas discharge port 2 for sand treatment and shot blasting |
Particulate matter |
30 |
|
Pouring exhaust vent |
Particulate matter |
30 |
|
Pouring exhaust vent |
non-methane total hydrocarbon |
120 |
|
Unorganized waste gas |
Particulate matter |
1 |
Integrated Emission Standard of Air Pollutants GB 16297-1996 |
5 |
Emission standard of air pollutants for foundry industry GB 39726-2020 1h average concentration value at monitoring point |
||
non-methane total hydrocarbon |
4 |
Integrated Emission Standard of Air Pollutants GB 16297-1996 |
|
30 |
Emission standard of air pollutants for foundry industry GB 39726-2020 Any concentration value at monitoring point |
Table3Hazardous waste generation and disposal
Name of hazardous waste |
Kind |
Unit |
amount of production |
Transfer amount |
DisposalMeasures |
waste molding sand |
General solid waste |
tons |
150 |
150 |
Outselling |
defective goods |
General solid waste |
tons |
0.5 |
0 |
Recast all |
dust collector dust |
General solid waste |
tons |
2.01 |
0 |
All recycling |
Waste packaging Materials |
General solid waste |
tons |
4 |
4 |
Sold to a recycling center |
electric furnace waste slag |
General solid waste |
tons |
151.65 |
151.65 |
Outselling |
Domestic garbage |
General solid waste |
tons |
12.8 |
0 |
After collection, the local sanitation department will uniformly clean up and dispose of them. |
Waste welding wire and welding slag |
General solid waste |
tons |
0.05 |
0.05 |
Collected and sold to waste recycling bin |
waste foam |
General solid waste |
tons |
0.01 |
0.01 |
Collected and sold to waste recycling bin |
Dust |
General solid waste |
tons |
56 |
0 |
All recycling |
Solid Waste Removal by Magnetic Separation |
General solid waste |
tons |
0.01 |
0.01 |
Outselling |
Ground-to-ground manganese fragments, fine particles |
General solid waste |
tons |
2.355 |
2.355 |
Outselling |
Waste mineral oil |
HW08 |
tons |
0.3 |
0.3 |
Temporarily stored in the hazardous waste room |
waste activated carbon |
HW49 |
tons |
0.056 |
0.056 |
Temporarily stored in the hazardous waste room |
Colorant empty bottle |
HW49 |
tons |
0.0508 |
0.0508 |
Temporarily stored in the hazardous waste room |
Empty waste bucket |
HW49 |
tons |
0.692 |
0.692 |
Temporarily stored in the hazardous waste room |
Previous Page